NEW QUESTION # 103
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
- A. Category 6/class E
- B. Category SA/class EA
- C. Category 5e/class D
- D. Category 7/class F
Answer: A
NEW QUESTION # 104
To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide ________ for every BAS outlet or device based on total floor area.
- A. 9.30 m2 (100 ft2)
- B. 23.20 m2 (250 ft2)
- C. 91.40 m2 (300 ft2)
- D. 152.40 m2 (500 ft2)
Answer: B
NEW QUESTION # 105
Which of the following is TRUE for tele communications spaces?
- A. Maintain aim (3.28 ft) clearance between equipment and plumbing fixtures such as mop sinks
- B. Relative humidity snail be maintained at 40% ± 5%.
- C. Plumbing piping not related to the support of the space should not pass through the space.
- D. Close proximity to water service is desired so consider locating the ER in the pipe chase.
Answer: C
NEW QUESTION # 106
An R&D group director approves a major program's charter although the director has a high level of understanding of the program's scope (hoy are unsure of how the program manager can be successful in delivering the program's commitments
What should the program manager do to align stakeholders with planning and monitoring the program's progress?
- A. Generate a supplier management plan to identify external stakeholders
- B. Create a communications management plan, and establish reporting formats
- C. Develop an accountability matrix, and assign program roles and responsibilities
- D. Establish high-level program milestones
Answer: B
NEW QUESTION # 107
Placement of a buried OSP pathway in public Rights of Way may require a permit based on which of the following?
- A. Bonding and grounding of metallic conductors
- B. Building entrance conduit plugging
- C. Locating of other utilities
- D. Fees calculated on distance
Answer: C
NEW QUESTION # 108
What is a passive optical network (PON)?
- A. A point-to-multipoint network architecture in which powered optical splitters are used to enable a single optical fiber strand to serve multiple end-points.
- B. A point-to-point network architecture in which unpowered optical splitters are used to enable a single optical fiber strand to serve multiple end-points.
- C. A point-to-point network architecture in which powered optical splitters are used to enable a single optical fiber strand to serve multiple end-points.
- D. A point-to-multipoint network architecture in which unpowered optical splitters are used to enable a single optical fiber strand to serve multiple end-points.
Answer: D
NEW QUESTION # 109
Which two of the following items MUST be included in a detailed SoW? (Select two options.)
- A. What type of work needs to be performed
- B. Who must approve the Scope of work
- C. How the contract performance will be evaluated/judged
- D. When the work will start
- E. A general description of work to be performed
Answer: A,D
NEW QUESTION # 110
An IT program manager is concerned that a program is not achieving its defined incremental benefits due to a lack of delivery by the business team. The IT team has several dependencies on the business team throughout the program. However the business team does not report to the IT program manager and only two business team resources with the appropriate skills are available to complete the required program tasks.
To address this issue, what should the IT program manager do next?
- A. Review and clarify the business team's program roles and responsibilities determine the schedule impact on benefits Delivery direct the IT project manager to meet with the business team to ensure dependencies are understood and that the appropriate resources can be made available.
- B. Schedule a meeting with the business team to discuss transferring the two business team resources to the IT team, update the program risk register to include risk mitigation steps
- C. Modify the program milestone dates to include a larger contingency, determine the impact on the project implementation date, and update the benefits management plan
- D. Escalate the lack of commitment by the business team to the program steering committee: hire a new project resource to complete the required tasks; update the program risk register to Include risk mitigation steps
Answer: A
NEW QUESTION # 111
Coupling with electrical circuits can create inductive interference to telecommunications facilities.
Which of the following can decrease the coupling effect?
- A. Decrease the physical separation
- B. Make sure that the single-phase components add in phase
- C. Increase the earth resistance
- D. Decrease the exposure length
Answer: A
NEW QUESTION # 112
A utility company manages its capital improvement projects (CIP) using engineers, project managers, and program managers. A new sponsor from the utility company assesses the CIP and decides to reorganize it into a program. They invite seven companies to discuss their approach to monitor and control the program and its constituent protects.
Where should the program manager incorporate this input?
- A. Program management plan
- B. Vendor management matrix
- C. Program risk management plan
- D. Stakeholder register
Answer: A
NEW QUESTION # 113
A request for proposal (RFP) yields a bid with a better delivery schedule and a lower cost, but originates from a vendor not on the prequalified vendor list During the final review of the RFPs the program manager is informed that the new bidder is a relative of the project manager. Although the bid meets all company policies, the program manager is concerned about a conflict of interest.
What should the program manager do?
- A. Advise the sponsor of a possible conflict of interest prior to awarding the bid
- B. Select the best bid from the prequalified vendor list
- C. Accept the bid from the new vendor and document the decision.
- D. Add the new vendor to the prequalified list and replace the project manager
Answer: A
NEW QUESTION # 114
A program manager needs to establish direction and identity the essential aspects of a program. In addition, they must ensure that the context and framework of the program are properly defined assessed and documented
Which document will be created to support this activity?
- A. Program management plan
- B. Program scope statement
- C. Program master schedule
- D. Program resource management plan
Answer: B
NEW QUESTION # 115
A multiyear program is ready to conclude. It has achieved all business objectives and is delivering its intended benefits. However the program sponsor is not willing to sign the formal program closure acceptance document and the program continues to incur operational costs.
What should the program manager do next?
- A. Ask key stakeholders to influence the program sponsor
- B. Direct component project managers to archive all relevant project documents
- C. Ask the finance department to increase the program budget
- D. Escalate the issue to the program governance board
Answer: D
NEW QUESTION # 116
CORRECT TEXT
A program manager joins a team during its preparation phase.
What should the program manager do lo obtain formal sponsor approval to begin the benefits delivery phase1?
- A. Identify and document the anticipated program benefits in the benefits management plan.
- B. Define a high-level program roadmap of milestones and schedules supported by a preliminary estimate
- C. Write the program charter, including the program mission statement and stakeholder engagement plan
- D. Develop the program management plan based on the organization's strategic plan
Answer: A
NEW QUESTION # 117
In a contiguous properly environment (e. g., where campus backbone cables exist), which two of the following are CRITICAL factors to understand for maintenance and growth purposes? (Select two options.)
- A. Familiarity with the routes and spaces (proper record keeping)
- B. Not able to determine the working capacity versus spare cable capacity
- C. Cable composition
- D. Fill ratio
- E. Cost analysis of the value of capex and capex models
Answer: A,E
NEW QUESTION # 118
66-style connecting blocks (certain designs) can support up to what category of transmission performance?
- A. Category 3
- B. Category 6A
- C. Category 5e
- D. Category 5
- E. Category 6
Answer: A
NEW QUESTION # 119
A critical program for a company fails lo delivers its intended benefits. The CEO and program sponsor are both held accountable and. ultimately, their employment is terminated by the board of directors
What should the program manager do before formally closing the program?
- A. Transfer all program documentation to the deputy program manager
- B. Establish a program management information system (PMIS)
- C. Share lessons learned with an program team members
- D. Update the benefits register
Answer: C
NEW QUESTION # 120
For a cable tray installed within an ER, the RECOMMENDED access headroom is:
- A. 203 mm (8 in).
- B. 254 mm (10 in).
- C. 152 mm (6 in).
- D. 305 mm (12 in).
Answer: D
NEW QUESTION # 121
A large international manufacturing company is centralizing its IT which is currently spread over 16 countries. The transition means physically regrouping the infrastructure and aligning processes and organizations.
The high-level scope of this transformation encompasses three main areas.
1. The technology area-assessing which technology/tooling should be retained for the target data center
2. The policies and procedure area-aimed at establishing a common set of processes supporting the new way of delivering services
3. The HR area-assuring the new organization best fits the diversity of the countries and functional domains, while offering equivalent compensations for comparable functions
You have selected your team and you are preparing the business case to support 1) the team selections you made and 2) your recommendation to proceed to the program's next phase
Which document should be present m your business case?
- A. An inventory detailing all physical and logical components in place and the employees in scope
- B. A cost/benefit analysis of the different scenarios, presenting their respective contributions
- C. A comprehensive analysis of the different compensation packages offered in the 16 countries
- D. A detailed plan showing dependencies among the constituent protects
Answer: B
NEW QUESTION # 122
Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)
- A. Electrical metallic tubing (EMT)
- B. Flexible metal conduit (FMC)
- C. Aluminum metal conduit (AMC)
- D. Intermediate metal conduit (IMC)
- E. Rigid metal conduit (RMC)
Answer: D,E
NEW QUESTION # 123
The program manager compiles a program performance report for review by the program governance board. The performance report indicates that the scope, quality and schedule objectives have been me, but costs and resource utilization are higher than expected. The program can no longer deliver the planned return-on-investment within an acceptable level and the intended benefits have not yet been realized
After further analysis of the performance indicators the program manager should do which of the following*?
- A. Transition the existing program results to the appropriate operational area
- B. Expand the scope and continue the program until return on investment objectives can be met
- C. Extend the schedule to reduce costs and resource utilization
- D. Recommend cancellation of the program based on performance metrics
Answer: D
NEW QUESTION # 124
The size and number of conduits or sleeves used for backbone pathways depend on the usable floor space served by the backbone distribution system.
What is the MINIMUM trade size of sleeves recommended to serve a TR, ER, or EF?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B
NEW QUESTION # 125
Exhibit:
A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (American with Disabilities Act) requirement for front reach using a wheelchair.
What will be the maximum reachable height or the value of "X"?
- A. 1170 mm (46 in)
- B. 760 mm (30 in)
- C. 1370 mm (54 in)
- D. 864 mm (34 in)
- E. 1220 mm (48 in)
Answer: E
NEW QUESTION # 126
Which two of the following may the ICT distribution designer need to provide in order to identify the BEST solutions for the client's need? (Select two options.)
- A. Recommendations for label design of outlets
- B. Color scheme for dropcables
- C. Documentation plan
- D. Preliminary budget numbers
- E. Time constraints and/or milestones
Answer: D,E
NEW QUESTION # 127
A program is developing a next-gene ration product line, and one component has been delivered. However, due to a change request, expectations for another component are unmet
What activity should the program manager perform next?
- A. Program performance monitoring and controlling
- B. Program delivery management
- C. Resource Interdependency management
- D. Benefits sustainment and program transition
Answer: A
NEW QUESTION # 128
......