
[Aug-2022] Pass 1z0-1082-22 Exam in First Attempt Updated1z0-1082-22 DumpsTorrent Exam Question
Oracle Enterprise Performance Management (EPM) Dumps 1z0-1082-22 Exam for Full Questions - Exam Study Guide
Oracle 1z0-1082-22 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
NEW QUESTION 19
Which two statements are true about allocation tracing?
- A. You select the rule you want to trace In the trace parameters.
- B. It is a graphical representation of how allocations flow in and out of application elements.
- C. You can trace allocation inputs and outputs both forward and backward.
- D. Allocation traces can be performed across multiple business dimensions simultaneously.
Answer: B,C
NEW QUESTION 20
Which two statements are true about the Simple Workflow mode in Data Management?
- A. It provides a performance Improvement when processing large volumes of data
- B. Drill down Is supported.
- C. You can view data in the Workbench after loading.
- D. It is the default mode for processing data.
- E. It limits data movement between staging tables.
Answer: B,C
NEW QUESTION 21
Which statement Is FALSE about Dimension Management In Profitability and Cost Management?
- A. Dimensions are imported using flat files or the Data Management feature.
- B. Profitability and Cost Management uses dimensions and members created In Oracle Essbase.
- C. You can manually edit Business, Attribute, and Point of View dimensions.
- D. System dimensions ore not displayed In Dimension Management.
Answer: B
NEW QUESTION 22
Which three are valid ways to create Profitability and Cost Management applications?
- A. Create a custom application with no dimensions, then create and load dimensions in Data Management.
- B. Create a custom application with dimensions from Hal files.
- C. Create a custom application from an Essbase outline file.
- D. Import a backup snapshot from another instance of Profitability and Cost Management,
- E. Migrate an exported on-premises Profitability and Cost Management application using a migration
Answer: C,D,E
Explanation:
template file.
NEW QUESTION 23
You update the name of a member that Is used In a number of allocation rules.
After deploying the changes to the database, what step can you take next to update your rules?
- A. Use the Find and Replace tool In the Manage Rules screen to replace the member In all rules that use It.
- B. On the Mass Edit tab of the Designer screen, create and run a job to replace the member in all rules that use it.
- C. The system automatically propagates the name change to your allocation rules; no additional step is necessary.
- D. Use the ReplaceMember command In EPM Automate to replace the member In all rules that use It.
Answer: D
NEW QUESTION 24
Given the following possible actions:
1. Register a Source System
2. Register a Target Application
3. Create an Import Format
4. Define a Location
5. Create a Point of View
6. Define mappings for Period and Category
7. Define mappings for all dimensions
8. Define mappings for only those dimensions requiring mappings
9. Create a Data Load Rule
What are the required steps in Data Management to create a data Integration for Profitability and Cost Management?
- A. 1,2,3,4,6,7,9
- B. 1,2,3,4,6,8,9
- C. 1,2,3,4,5,6,7,9
- D. 1,2,3,4,5,6,8,9
- E. 1,2,3,4,8,0
Answer: E
NEW QUESTION 25
Which set of dimensions Is required for Profitability and Cost Management applications?
- A. Two system dimensions (Balance and Rule), at least one Business dimension, at least one POV dimension, at least one Alias dimension
- B. Three system dimensions (Balance, Rule, and Drivers), at least one Business dimension, at least one POV dimension
- C. Two system dimensions (Balance and Rule), at least one Business dimension, at least one POV dimension
- D. Three system dimensions (Balance, Rule, and Drivers), at least two Business dimensions, at least one POV dimension
- E. Two system dimensions (Balance and Rule), at least one Business dimension, at least one POV dimension, at least one Attribute dimension, at least one Alias dimension
Answer: E
NEW QUESTION 26
Which two statements are true about managing Points of View (POVs)?
- A. When you add a new POV, the status Is automatically set to Draft.
- B. You can archive POVs, but you cannot delete them.
- C. Global rules and rule sets are not associated with a specific POV.
- D. All POVs are data POVs, even If the data set Is empty.
- E. A POVs status is automatically changed to Calculated when you calculate the POV.
Answer: A,B
NEW QUESTION 27
Which two statements are true about dashboards?
- A. Dashboards can be enabled and disabled.
- B. All users can create and edit dashboards.
- C. You can drag and drop chart tiles to change the dashboard layout.
- D. Charts In dashboards are based on existing Analysts Views.
Answer: C,D
NEW QUESTION 28
Which three are valid statements about Locations In Data Management?
- A. Different locations can use the same import format.
- B. A location may have more than one source system.
- C. A location can be assigned to more than one data load rules.
- D. You can create duplicate locations with the same source system and application combination.
- E. A location can be assigned to more than one Import format.
Answer: A,C,D
NEW QUESTION 29
You are creating a rule set for allocation rules. On the description tab, you select Use Global Context. Which two statements are true?
- A. On the Context tab for the rule set, you define default members for use In all rules added to the rule set.
- B. At the rule level, the Rule Context tab is where you can edit any default contexts applied to the rule.
- C. You can override the global context dimension selections at the rule set level.
- D. When you select Use Rule Set Context for a rule In this rule set, the dimension-member combinations defined In the Global Context section are also applied.
Answer: B,D
NEW QUESTION 30
Which two are required steps In creating an allocation rule?
- A. Assign the rule sequence number,
- B. Create a rule set context.
- C. Create at least one global context.
- D. Create a rule set for the rule.
Answer: B,D
NEW QUESTION 31
Which custom calculation formula Is syntactically correct?
- A. [Adjustment In]:= ([Input], [Rule]) * .15;
- B. [Adjustment In]:= [Input],[Rule] *.15
- C. (Adjustment In)= (Input, Rule) - .15;
- D. [Adjustment In]= ([Input], (Rule]) * .15
- E. [Adjustment In]= ([Input], [Rule]) * .15;
Answer: E
NEW QUESTION 32
After running a calculation, you are evaluating the results In the Rule Balancing screen. What can you do to Investigate the data In more detail?
- A. Click on a value to open a context sensitive query in Smart View.
- B. Click on a rule number to open a report showing the entire allocation flow.
- C. Click on a value to drill down to more detail in the Rule Balancing screen.
- D. Click on either Allocation in or Allocation Out to open an Allocation Trace.
Answer: C
NEW QUESTION 33
Which two statements are true about allocation offset for allocation rules?
- A. By default, offsets are written to the source.
- B. Defining an allocation offset Is optional.
- C. The offset location defines the member to hold any unallocated data from the source.
- D. Offsets are written to the Allocation Offset member of the Balance dimension, in combination with the other dimension members defined for the offset.
Answer: B,C
NEW QUESTION 34
Which dimension Is required for a Profit Curve chart In the application?
- A. Department Dimension
- B. Profit Dimension
- C. Point of View Dimensions
- D. Profit Attribute Dimension
Answer: B
NEW QUESTION 35
Which Is NOT a valid Point of View (POV) state?
- A. Published
- B. Archived
- C. Draft
- D. Final
Answer: B
NEW QUESTION 36
Which two statements are true about Period and Category Mapping definitions In Data Management?
- A. You use source level period mapping when you have multiple target applications and various source systems with different period types.
- B. Period and category mappings are defined separately from data load member mapping.
- C. Period mappings define the mapping between ERP calendars and Profitability and Cost Management years and periods.
- D. If the source category matches the target category in Data Management (e.g. "Actual" to "Actual"), then a category mapping definition Is not required.
Answer: A,C
NEW QUESTION 37
Which two statements are true about model validation?
- A. Model validation validates rules, rule sets, and dimensions.
- B. After the application is deployed, it can detect invalid model artifacts if changes are made to dimensions.
- C. You cannot deploy the application if model validation returns Invalid conditions.
- D. Running a model validation displays an error table with Information about Invalid conditions.
Answer: A,D
NEW QUESTION 38
......
Authentic Best resources for 1z0-1082-22 Online Practice Exam: https://guidetorrent.dumpstorrent.com/1z0-1082-22-exam-prep.html